| Code | Project | Location | Client Employer | Year Complated |
|---|---|---|---|---|
| CP-90 | SHANK RUNWAY, AIRLIFT APRON, ROTARY WING RUNWAY, TAXIWAYS & PARKING APRON (100% DESIGN) | AFGHANISTAN | USACE / METAG Inc. | 2009 |
Brief description of project and relevance to the contract:
(100% A&E design services)
Project covered topo surveys, soil investigations and geotechnical and hydrological studies, preparation of 65%, 95%and 100% submittals including design calculations, drawings and technical specifications. GEMAS Design Team also carried out the construction design supervision and inspection services at the job site and attended the design meetings with USACE on site.
The following is a list of the works completed:
• Runway 63806 m², Taxiways 3880m²,
• Airlift Aprons 14963 m²,
• Rotary Wings Runway 14030m²,
• Rotary Wings Taxiways 3050 m²,
• Rotary Wings Apron 59231 m²