| Code | Project | Location | Client Employer | Year Complated |
|---|---|---|---|---|
| CP-91 | KABUL KAIA NORTH RELOCATION OF FACILITIES (100% DESIGN) | AFGHANISTAN | NSPA / YUKSEL Inc. | 2008 |
Brief description of project and relevance to the contract:
(100% A&E design services)
GEMAS responsibility covers the design of site civil works including Roads, Storm Drainage System, Water Supply and Distribution System, Sewage Collection and Treatment, Fire Hydrant System, Landscaping and Irrigation System; site electrical works including High Voltage and Low Voltage Power Distribution System and Mechanical and Electrical designs for the following facilities:
– HQ Main and AOC/Force Protection/AIS-FSO Bldg.
– Passenger Terminal (PRC), Cargo Office and Cargo Tents
– Helicopter Hangar, Role 1 MTF
– CIS Building, Workshop/Supply Building
– Camp Facilities Maintenance Building, SNIC Building,
– Fuel Station and Car Wash, Solid Garbage Treatment Plant
– Accommodations Buildings Type A, B and C
– MWA/Gymnasium, Sports Fields, Dog Kennel
– Dining Hall, Laundry Building, Meteorology Building, Follow-me Building

